Productivity of plywood sander: single-sided sanding Q=T*u*k1*k2/L sheets/class
Double-sided sanding Q=T*u*k1*k2/2L sheets/class
In the formula: T——shift working time (450 minutes)
u——feeding speed (20m/min)
k1——feed filling factor 1
k2 - time utilization factor 0.9
Required number of units N=∑n/Q
In the formula: ∑n——the total number of plywood sheets to be trimmed in a shift
∴4’*8’:
Q5=450*20*1*0.9/(2*1.83) = 2213 sheets/class
∑n5=∑n1+∑n2=1368 sheets/class
N5=∑n5/ Q5=0.62
3'*6':
Q6=450*20*1*0.9/(2*1.37) =2956 sheets/class
∑n6=∑n3+∑n4=10172956 sheets/class
N5=∑n5/ Q5=0.34
Ntotal = N5+ N6=0.96
To sum up, take 1 set.